22 April 2008

ASX Announcement

CONTINUING STRONG DRILL RESULTS AT BLAIR MINE

L03C Resource Upgrade Expected

Australian Mines (ASX:AUZ) continues to intersect significant mineralisation in its 2008 resource drilling at Blair Deeps at the Blair Mine, located 32km from Kalgoorlie WA.

Further high grade intersections in the L03C shoot suggest the strike extent of this shoot may be returning to lengths seen higher in the mine.

The contained nickel metal per vertical metre within L03C shoot can be expected to increase assuming that the trend of increasing shoot length is maintained.

The latest downhole intersections returned from L03C shoot are:
  • AMUG300 – 9.9m @ 3.08% Ni
  • AMUG302 – 7.8m @ 3.46% Ni

The E03C shoot has also returned further results which indicate the shoot is continuing at depth with similar style of mineralisation to that seen in the deepest level so far developed on the shoot, which is some 55m above the latest drill intersections.

The latest significant downhole intersection returned from E03C shoot is:
  • AMUG302 – 6.5m @ 3.27% Ni

N03C shoot has also returned mineralisation consistent with expectations, the latest downhole intersection being:
  • AMUG303 – 8.2m @ 1.97% Ni
Hole ID Northing (m) Easting (m) RL (m) Azi Dip Depth (m) From (m) To (m) Length (m) Ni (%)
AMUG300 6578944 376823 379 264 -32.4 140.3 88.2 98.1 9.9 3.08
              110.7 111.2 0.5 6.7
AMUG302 6578950 376818 353 260 -23.6 135.0 52.5 60.3 7.8 3.46
              92.0 98.5 6.5 3.27
AMUG303 6578946 376824 380 319 12.6 41.8 28.6 36.8 8.2 1.97
 
Australian Mine’s Chief Operating Officer, Mr Brett Young said, “These encouraging results continue to build on the excellent resource results achieved thus far in our 2008 resource drilling programme, further underpinning the extension of the mine life at Blair.

“Given that Blair is mining at 50 – 60 vertical metres per year at present, drilling 100 vertical metres below the current workings and adding reserves is likely to increase mine life by at least 2 - 3 more years with the potential for further mine life due to the ore bodies remaining open at depth”.

The resource drilling programme is continuing with further drilling targeting depth extensions of the major ore shoots at Blair Deeps.

For further information contact:
Brett Young
Chief Operating Officer
Australian Mines Limited
Tel: 08 9481 5811

For media enquiries contact:
Robert Williams
Farrington National
Tel: 02 9332 4448

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr M Elias who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Elias is employed by CSA Australia Pty Ltd and is a Non-Executive Director of AUZ. Mr Elias has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’
Email Subscription


Latest News
Mt Martin Optimisation Study Results 21 July 2010
The recently completed optimisation study has indicated that an open pit mine would make a significant profit with various treatment options producing 50,000 - 60,000 ozs of Au at a gold price of A$1,300/oz
Mt Martin Exploration Update 9 July 2010
Encouraging results have been received from recent drilling of East Shear North
exploration target which lies to the east of the main Mt Martin pit.
50% Increase in gold Resources at Mt Martin 25th June 2010
Australian Mines Limited (ASX:AUZ) is pleased to announce an increase of approximately 50% in gold resources at the Mt Martin mine.
Mt Martin Resource Definition Drilling Recommences June 2010
Australian Mines Limited (ASX:AUZ) is pleased to announce that surface drilling will recommence at Mt Martin on Monday 14th June 2010 to further define new resources at Mt Martin.
Mt Martin RC Drill Results East Lode Pit May 2010
Australian Mines Limited (ASX:AUZ) is pleased to announce very encouraging results from its latest RC drilling under the East Lode pit at the Mt Martin Project
Drilling Recommences at Mt Martin 20/04/10
AUZ Mines which announced encouraging results on 6th April from drilling its 100% owned Mt Martin gold project will be recommencing drilling this week.
Copyright © 2010 Australian Mines | Disclaimer | Privacy