17th August 2007
 
ASX Announcement
 

UPDATE : MARRIOTT’S NICKEL PROJECT

 

Impressive High Tenor Intercept
 

Australian Mines Limited (ASX: AUZ) is pleased to announce another impressive high grade intercept from resource definition diamond drilling at the Marriott’s nickel project, which is 65 km from  Leinster in W.A.

 
  • AMMD023 : 15m true width @ 2.46% Ni  from 129m downhole

(including 2m @ 4.24%Ni and 6m @ 5.18%Ni as coarse blebby and veinlet nickel sulphides)

 

The latest results are particularly pleasing as AMMD023 contained individual one metre assays of up to 8.5% Ni.  Furthermore, the hole  was drilled less than 20 metres down dip from AMMD022, which returned  15m true width  @ 2.18% Ni from 125m downhole,  including 3m @ 3.89% Ni and 3m @ 4.34% Ni as coarse blebby and veinlet sulphides.

 

Commenting on the latest results Chief Operating Officer, Brett Young said,

“The drilling has indicated we have potentially significant tonnages of high grade ore at Marriott’s which is very encouraging from a mine planning perspective and may lead the company to consider an underground mine option. Additional drilling is warranted as the high grade trend is open both down dip and along strike”.

 

“We are still receiving assay results from the recently completed 29 hole drill programme, and anticipate to release the final results within the current quarter.”

 
 
 
For further information contact:

Brett Young

Chief Operating Officer

Australian Mines Limited

Tel: 08 9481 5811

For media enquiries contact:

Robert Williams

Farrington National

Tel: 02 9332 4448

 

 

Email Subscription


Latest News
Strong Quarterly Result at Blair Nickel Mine
Australian Mines (ASX: AUZ) has achieved a quarterly production result of 450 contained nickel tonnes for the June 2008 quarter at the 100%-owned Blair Mine, located 32 kms from Kalgoorlie in W.A
Goodyear Nickel Drilling Commences
Australian Mines Limited is pleased to announce that extensional diamond drilling and down hole surveys have commenced at the company
Production Increases Significantly
Australian Mines has achieved its best quarterly production result since the June 2005 quarter at the 100%-owned Blair Mine, located 32 kms from Kalgoorlie in W.A.
Continuing Strong Drill Results
Australian Mines continues to intersect significant mineralisation in its 2008 resource drilling at Blair Deeps at the Blair Mine, located 32km from Kalgoorlie WA.
Significant High Grade Drill Intersection at Blair
Australian Mines (ASX:AUZ) has recommenced 2008 resource definition drilling at Blair Deeps with drilling initially targeting the high grade E03C shoot below current workings at the Blair Nickel Mine located 32kms from Kalgoorlie.
Nickel Production Expected to Grow in 2008
Australian Mines is forecasting a continuation of improving production at its 100%-owned and operated Blair Nickel Mine following good progress with the development of the Blair Deeps orebody.
Copyright © 2008 Australian Mines | Disclaimer | Privacy